{"id":2885,"date":"2024-03-29T03:07:00","date_gmt":"2024-03-29T03:07:00","guid":{"rendered":"https:\/\/kelmiskiams.lt\/?p=2885"},"modified":"2024-03-28T14:18:28","modified_gmt":"2024-03-28T14:18:28","slug":"ignitis-renewables-ruosiasi-dideliu-vejo-elektriniu-daliu-gabenimui","status":"publish","type":"post","link":"https:\/\/kelmiskiams.lt\/?p=2885","title":{"rendered":"\u201eIgnitis renewables\u201c ruo\u0161iasi dideli\u0173 v\u0117jo elektrini\u0173 dali\u0173 gabenimui"},"content":{"rendered":"\n<p>Pirmosiomis baland\u017eio dienomis didel\u0117s v\u0117jo elektrini\u0173 dalys pajud\u0117s i\u0161 Klaip\u0117dos uosto \u012f Kelm\u0117s rajon\u0105, kur \u017ealiosios energetikos bendrov\u0117 \u201eIgnitis renewables\u201c vysto did\u017eiausi\u0105 sausumos v\u0117jo j\u0117gaini\u0173 park\u0105 Baltijos \u0161alyse. Parkas i\u0161kils per \u0161iuos metus, o elektros energij\u0105 prad\u0117s generuoti 2025-aisiais.<\/p>\n\n\n\n<p>V\u0117jo elektrini\u0173 ment\u0117s, nacel\u0117s ir bok\u0161to dalys jau pasiek\u0117 Klaip\u0117dos uost\u0105 ir i\u0161 jo pajud\u0117s baland\u017eio prad\u017eioje.<\/p>\n\n\n\n<p>Specialaus transporto mar\u0161rutai nusidrieks autostrada, Klaip\u0117dos, Raseini\u0173 bei Kelm\u0117s rajon\u0173 keliais. Kiekviena v\u0117jo elektrini\u0173 detal\u0117 yra nuo 50 iki daugiau nei 80 metr\u0173 ilgio, tad tokio ne\u012fprasto dyd\u017eio krovinio gabenimas reikalauja kruop\u0161taus pasirengimo.<\/p>\n\n\n\n<p>\u201eSiekiame ne tik saugiai nugabenti ne\u012fprast\u0105 krovin\u012f, bet ir nesukelti nepatogum\u0173 eismo dalyviams bei vietos gyventojams. D\u0117l \u0161ios prie\u017easties tokie kroviniai gabenami nakties metu, kuomet eismo intensyvumas ma\u017eas. Taip pat nuolat investuojame \u012f savivaldybi\u0173 infrastrukt\u016br\u0105, idant esama keli\u0173, kuriais naudojasi ne tik m\u016bs\u0173, bet ir kit\u0173 vystytoj\u0173 transportas, b\u016bkl\u0117 ne tik neblog\u0117t\u0173, ta\u010diau ir b\u016bt\u0173 pagerinta. Atsipra\u0161ome gyventoj\u0173 u\u017e laikinus nepatogumus ir pra\u0161ome kantrumo\u201c, \u2013 teigia \u201eIgnitis renewables\u201c atstovas spaudai Paulius Kalmantas.<\/p>\n\n\n\n<p>Pasak jo, \u0161iuo metu \u012fmon\u0117s vystomo parko teritorijoje jau baigiami ruo\u0161ti pamatai v\u0117jo elektrin\u0117ms, tiesiami kabeliai, atliekami kiti darbai. Pa\u010dias elektrines planuojama sumontuoti iki met\u0173 galo, o kit\u0173 met\u0173 prad\u017eioje jas i\u0161bandyti ir prad\u0117ti gamyb\u0105.<\/p>\n\n\n\n<p><em><strong>Gyventojai, turintys klausim\u0173 d\u0117l did\u017eiagabaritini\u0173 komponent\u0173 transportavimo ir statyb\u0173, kvie\u010diami kreiptis tel.+370 698 41497 arba el. pa\u0161tu kelme@ignitis.lt<\/strong>.<\/em><\/p>\n\n\n\n<p><strong>Reik\u0161mingas regionui projektas<\/strong><\/p>\n\n\n\n<p>\u201e\u0160is projektas leis patenkinti vis labiau augan\u010di\u0105 \u017ealiosios energijos paklaus\u0105 regione. Didindami \u017ealiosios energijos gamybos apimtis, prisidedame prie \u0161alies energetinio saugumo ir sudarome s\u0105lygas atsisakyti i\u0161kastinio kuro vartojimo. V\u0117jas yra neribotas i\u0161teklius, kuris leid\u017eia gaminti \u0161vari\u0105 energij\u0105, ma\u017einti tar\u0161\u0105 ir taip prisid\u0117ti prie klimato kaitos padarini\u0173 ma\u017einimo\u201c, \u2013 sako P. Kalmantas.<\/p>\n\n\n\n<p>V\u0117jo parke Kelm\u0117s rajone i\u0161 viso i\u0161kils 44 v\u0117jo elektrines. Bendra potenciali parko galia sieks 300 megavat\u0173 (MW), o jo pagaminamos elektros energijos pakaks apr\u016bpinti 250 t\u016bkst. nam\u0173 \u016bki\u0173 Lietuvoje.<\/p>\n\n\n\n<p>\u201eIgnitis renewables\u201c veikia trijose Baltijos \u0161alyse ir Lenkijoje, kur \u012fgyvendina energijos gamybos i\u0161 atsinaujinan\u010di\u0173 \u0161altini\u0173 (v\u0117jo, saul\u0117s), \u012fskaitant biomas\u0117s ir atliek\u0173 deginim\u0105, projektus. \u0160iuo metu \u012fmon\u0117 valdo 4 v\u0117jo parkus Lietuvoje \u2013 Jurbarko, Kretingos, Taurag\u0117s ir Ma\u017eeiki\u0173 rajonuose. V\u0117jo parkas Kelm\u0117s rajone yra did\u017eiausias \u201eIgnitis renewables\u201c sausumos v\u0117jo parkas, kuris yra reik\u0161mingas projektas didinant \u012fmon\u0117s v\u0117jo park\u0173 projekt\u0173 portfel\u012f Lietuvoje bei \u017ealios energijos gamybos paj\u0117gumus.<\/p>\n\n\n\n<p>\u201eIgnitis grup\u0117\u201c nuolat didina \u017ealiosios energijos gamyb\u0105 ir iki 2030 m. planuoja pasiekti 4\u20135 gigavatus (GW) instaliuotos galios paj\u0117gumus i\u0161 atsinaujinan\u010di\u0173 \u0161altini\u0173.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" src=\"https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-1024x682.jpg\" alt=\"\" class=\"wp-image-2888\" srcset=\"https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-1024x682.jpg 1024w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-300x200.jpg 300w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-768x512.jpg 768w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-1536x1023.jpg 1536w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Logistika-22-2048x1364.jpg 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img decoding=\"async\" loading=\"lazy\" src=\"https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Apmoketas-turinys.png\" alt=\"\" class=\"wp-image-2886\" width=\"148\" height=\"148\" srcset=\"https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Apmoketas-turinys.png 500w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Apmoketas-turinys-300x300.png 300w, https:\/\/kelmiskiams.lt\/wp-content\/uploads\/2024\/03\/Apmoketas-turinys-150x150.png 150w\" sizes=\"(max-width: 148px) 100vw, 148px\" \/><\/figure><\/div>","protected":false},"excerpt":{"rendered":"<p>Pirmosiomis baland\u017eio dienomis didel\u0117s v\u0117jo elektrini\u0173 dalys pajud\u0117s i\u0161 Klaip\u0117dos uosto \u012f Kelm\u0117s rajon\u0105, kur \u017ealiosios energetikos bendrov\u0117 \u201eIgnitis renewables\u201c<\/p>\n","protected":false},"author":2,"featured_media":2887,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"om_disable_all_campaigns":false,"_mi_skip_tracking":false},"categories":[4],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/posts\/2885"}],"collection":[{"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2885"}],"version-history":[{"count":2,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/posts\/2885\/revisions"}],"predecessor-version":[{"id":2892,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/posts\/2885\/revisions\/2892"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=\/wp\/v2\/media\/2887"}],"wp:attachment":[{"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2885"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2885"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kelmiskiams.lt\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2885"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}